









Quality control
Contact Us
Add:Maisheng tempered glass Co.,Ltd. national highway 106 Wen'an County Hebei Province.China
WhatsApp:+86 13722758691
Tel: +86 13722758691
E-mail: glass@beilong-industry.com
First inspection of each process of glass
1. Objective: To standardize the inspection process of the first piece of the company's glass manufacturing process (cutting/edging/cleaning/tempering/screen printing/drying/laminating).
2. Scope of application: Applicable to the company's glass process (cutting/edging cleaning/tempering/screen printing/drying/laminating) first part inspection.
3. First inspection process, responsibilities and working requirements of each glass process (cutting/edging cleaning/tempering/silkscreen drying).
Flow | Duty | Job requirement | Relevant documents and records |
![]() |
Production supervisor |
1. When the first product of the glass process (cutting/edging/cleaning/toughening/screen printing/drying/laminating) is produced, the production supervisor informs the inspector to carry out the first inspection: | |
QC | 2. The QC receiving the notice shall immediately implement the first inspection. The QC shall implement the first inspection of size and appearance with the corresponding testing tools based on :1, product drawing 2, customer standard 3, inspection process 4, sample, etc. : Size first inspection quantity N=2 pieces: release standard Ac=0/R e=1: Appearance first inspection quantity N=5 pieces, release standard Ae=0/Re=1. The process has performance testing requirements in accordance with the inspection specification | Product drawing Customer standard Inspection specification |
|
Production supervisor QC |
3. If the first inspection is not qualified, the QC feedback process (cutting/edging cleaning/toughening/screen printing/drying/lamination) monitor will carry out on-site rectification, and timely feedback the major anomalies that cannot be rectified on site to the quality Department and Production Department: record them in the Quality Abnormal Record, and enter the Quality Abnormal Processing Process after the production department head signs and approves them. | Quality exception record | |
Production supervisor QC |
4. If the first inspection passes, QC records the inspection time and data in the Process First Inspection Record and signs it with each process monitor: | Process first check record |
Related download
Test document
Our Product
About us
Contact Us
Maisheng tempered glass Co.,Ltd. national highway 106 Wen'an County Hebei Province.China
HEBEI AOTUAN TECHNOLOGY CO., LTD
SAF Coolest v1.2 设置面板 QBYSX-ZJPV-HDSFE-ZZF
无数据提示
Sorry,The current column has no content!
You can view other columns or return Home